SOUTHEND, CARE HOME

Southend


PROJECT VALUE

£1.8m


SCOPE OF WORKS

Site clearance, including earthworks
600mm Depth Piling mat 4000m2 with reinforced geo-grid
Storm and foul drainage up to 3m in depth, including connection works
S278 crossovers onto existing highways
Piling attendance
Ground beams & pile caps, including holding down bolts for the steel frame
Basement works including a cofferdam safe working system due to the proximity of existing buildings, site boundary and road, depth of the basement 8m from ground level, SIKA waterproof concrete and membranes used to obtain sufficient warranties for our client
Storm attenuation tanks with a flow control system at the outfall
External package including tarmac, paving & retaining walls